Calendar  ⋅  Contact  ⋅  Documents  ⋅  Employment  ⋅  FAQs  ⋅  Maps  ⋅  News  ⋅  Online Services  ⋅  Projects

Featured News

Photo of Town Clerk Julie Bower and OV Seal

Oro Valley Town Talk: Voters turn out for Oro Valley election

On Aug. 26, the Town of Oro Valley conducted its primary election. Previously, the town’s nonpartisan primary and general elections were held in March and May respectively and conducted as mail ballot elections. Due...more

Fall 2014 Surface Treatments

  • (07/29/14) Major streets to be resurfaced: La Cholla Blvd (from Lambert to Tangerine), Magee Rd (from Oracle to First Ave), Shannon Rd (from Lambert to Naranja).
  • (07/29/14) Major streets to be resurfaced: La Canada Drive (from the bridge to Moore ), Tangerine Rd (from Shannon to First Ave), Naranja Drive (from La Cholla to La Canada ).